Roberdel Baptist installs new steeple

By Kevin Spradlin
PeeDeePost.com

ROBERDEL — Workers with FineLine Construction, of Raleigh, spent a little more than 10 hours on Saturday replacing a dilapidated steeple on top of Roberdel Baptist Church, located at 1118 Richmond Road in Rockingham.

Kevin Spradlin | PeeDeePost.com

Kevin Spradlin | PeeDeePost.com

The 126-year-old facility’s steeple had shown signs of wear and tear, including rotting and leaking. Underneath the steeple is the church’s sound equipment wires, the mix if rainwater and cable was not a good one.

The workers began at about 7 a.m. and finished up a little bit after 5 p.m. installing the new steeple, which was made by Taylorsville-based Piedmont Fiberglass.

The church celebrated its 126th anniversary in October.

Kevin Spradlin | PeeDeePost.com

Kevin Spradlin | PeeDeePost.com

 

Filed in: Latest Headlines

You might like:

M. Bishop sinks putt for Mixed Division playoff win M. Bishop sinks putt for Mixed Division playoff win
Von Hagel wins drawing for Pixel Von Hagel wins drawing for Pixel
Application period open for club sponsorship Application period open for club sponsorship
S. Farris wins Player of the Year S. Farris wins Player of the Year
© 2024 AlleganyPlayground.com. All rights reserved. XHTML / CSS Valid.